-
Senior Member
Mach 1 Project Build Installing Subframe Connectors - In With The New
Mach 1 Project Build Installing Subframe Connectors - In With The New
MM&FF Introduces Its Newest Project, An '03 Mach 1.The introduction of a new project car is an exciting event. There's a certain level of anticipation as an idea becomes reality. During a conversation amongst the MM&FF staff, we realized there hasn't been a Four-Valve project since our beloved Superfly, Destroyer of Hideous Camaros graced the pages of Muscle quite a few years ago. Jim Campisano's '97 Cobra was at the forefront of Mustang and Four-Valve technology for its time, and still to this day delivers a level of performance matched by few Four-Valve SN-95s.
Photo Gallery: Mach 1 Project Build Installing Subframe Connectors - Muscle Mustangs & Fast Fords Magazine
Photo Gallery: Mach 1 Project Build Installing Subframe Connectors - Muscle Mustangs & Fast Fords Magazine
Read More | Digg It | Add to del.icio.us
Complete Story...
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules